top of page
Copyright Fraport – Bombardier APM People Mover System at Frankfurt Airport

Our Projects 

Stay up to date and informed on all the latest and upcoming projects from Logplan.

The DEN automated guideway transportation system (AGTS) that connects the terminal to the concourses...

AGTS 300R Vehicles

International Airport

| Denver

DEN

| Denver AGTS

View Project 

A major airport expansion study with a projected cost of roughly $8.5 billion renovate the existing Terminal 2 to build....

Airport Campus Expansion, Global Terminal

International Airport

| Chicago O'Hare

ORD

| Chicago O'Hare

View Project 

DEN had (9) locations in the Airport where bags receive the final screening before being placed on the plane...

Consolidated CBRA (C-CBRA)

International Airport

| Denver

DEN

| Denver CBRA

View Project 

Fort Wayne International Airport engaged the Transportation Security Administration regarding the Terminal...

Terminal Building Improvement TSA-CBIS

International Airport

| Fort Wayne

FWA

| Fort Wayne

View Project 

A pre-screening conveyor distribution loop was developed as a solution to allow for the reconfiguration of the Jeppesen...

Pre-Screening Distribution Loop Level 5.5

International Airport

| Denver

DEN

| Denver Level 5.5

View Project 

Logplan participated in several connectivity planning studies for the MSC facility for both APM and BHS systems...

Midfield Satellite BHS System

International Airport

| Los Angeles

LAX

| Los Angeles

View Project 

Logplan reviewed the existing facility inventory, physical conditions, terminal operations, current peak-period...

Masterplan Update

International Airport

| Pittsburgh

PIT

| Pittsburgh

View Project 

bottom of page